| |||
horizontal and vertical survey (rechnik) | |||
completion survey | |||
Primary Survey Control (A system of primary survey control (basis for setting out) has been established in the construction documents by the Engineer for use by the Contractor. Kenny Gray) | |||
compilation survey; field compilation survey; horizontal and vertical control (Natalia1809) |
планово-высотное обоснование : 12 phrases in 3 subjects |
Cartography | 10 |
Ice formation | 1 |
Surveying | 1 |