| |||
Leak off test | |||
| |||
formation integrity test (FIT is conducted to confirm a good cement job or determine the formation's resistance to fracture. The most common method is the leak-off test (LOT) where pressure is applied until the formation accepts a small amount of drilling fluid. An optional method is the formation integrity test which confirms that the formation can resist a pre-determined amount of pressure. traduiser) | |||
leakoff test; breakdown test (BDT); formation leak off test (LOT) |
Испытание на гидроразрыв : 9 phrases in 3 subjects |
Drilling | 1 |
General | 3 |
Sakhalin | 5 |