metoda přidělení s pevnou procentní sazboufixed percentage allocation method (A method for calculating allocations based on a specified percentage)
metoda přidělení s pevnou váhoufixed weight allocation method (A method for calculating allocations by using weighted values)
odhad projektu s pevnou cenoufixed-price project estimate (The estimated total cost to complete a fixed-price project)
pevná databázová rolefixed database role (A predefined role that exists in each database. The scope of the role is limited to the database in which it is defined)
pevná mezeranonbreaking space (A space that is used to prevent multiple words from breaking if they fall at the end of a line)
pevná mřížkafixed grid (Grid lines on the drawing page that stay the same distance apart when you zoom in or zoom out of a drawing)
pevná pomlčkanonbreaking hyphen (A hyphen that is used to prevent a hyphenated word, number, or phrase from breaking if it falls at the end of a line)
pevná role serverufixed server role (A predefined role that exists at the server level. The scope of the role is limited to the SQL Server instance in which it is defined)
pevná spotřeba materiálufixed material consumption (Absolute quantity of a material resource to be used to complete an assignment. A fixed consumption rate indicates that the amount of material used will be constant, regardless of changes to task duration or assignment length)
projekt s pevnou cenouFirst Expiry First Out (A method used for determining the order in which goods should be taken out of inventory, so that items with the earliest expiration dates are taken first)
projekt s pevnou cenoufixed-price project (A type of project in which the customer pays a predetermined amount for the entire project)
textový soubor s pevnou šířkoufixed-width text file (A file containing data, where each field has a fixed width)
úkol s pevnou dobou trvánífixed-duration task (A task in which the duration is a fixed value and any changes to the work or the assigned units [that is, resources] don't affect the task's duration. This is calculated as follows: Duration x Units = Work)