DictionaryForumContacts

   English
Terms for subject Microsoft containing Schedule | all forms | exact matches only
EnglishSpanish
budget scheduleprogramación de presupuesto (A schedule for the planned expenditure of allocated financial resources)
Class SchedulePlan de clase (A view in which you can organize class materials into assignments and lessons)
delivery scheduleprogramación de entrega (A schedule for the planned delivery of products)
file replication scheduleprogramación de replicación de archivos (The schedule by which Directory Services user lists that are newly uploaded are added to the Administration Center and to e-mail servers worldwide)
finite schedulingprogramación limitada (A scheduling method that assumes that limited capacity for labor and machines is available)
job scheduleprograma de trabajos (The optimal dates and times for performing jobs at a work center)
master project scheduleprogramación de proyecto maestro (A schedule that identifies all the project's activities and milestones, consolidating all team and role schedules. The master project schedule is a deliverable of the planning phase)
master schedulingprogramación maestra (The process for generating a timetable for matching supply with demand)
process schedulingprogramación de procesos (The assignment of business intelligence tasks for users, roles, and PerformancePoint Planning Server)
production scheduleplan de producción (A schedule to produce a specific item and item quantity at a specific time and by specific human and operational resources)
production scheduleprevisión de producción (A schedule to produce a specific item and item quantity at a specific time and by specific human and operational resources)
report-specific scheduleprogramación específica del informe (Schedule defined inline with a report. Report-specific schedules are defined in the context of an individual report, subscription, or report execution operation to determine cache expiration or snapshot updates)
Schedule a Conference...Programar una conferencia... (An item on the Actions menu that opens a new Outlook meeting invitation using the user's conferencing information)
Schedule a MeetingProgramar una reunión (A menu item that opens an Outlook meeting invitation prepopulated with the selected contact(s))
schedule groupgrupo de programación (In the Concurrency Runtime, a container for related tasks that are queued to a Task Scheduler)
Schedule Important Software UpdatesProgramar actualizaciones de software importantes (A tool on the main Windows SteadyState interface used to set schedules for software and operating system updates)
schedule performance index The ratio of the earned value (EV), which is sometimes referred to as the budgeted cost of work performed (BCWP), to the planned value (PV), which is sometimes referred to as the budgeted cost of work scheduled (BCWS). SPI is often used to estimate the project completion date. The SPI value is calculated as follows: SPI = EV/PV. If the resulting SPI value is less than 1.0, that indicates that less work was completed on the project than was planned. If the SPI value is 1.0 or greater, that indicates that more work was completed than was planned; SPIíndice de rendimiento de programación (SPI)
schedule variancevariación de programación (The difference between the budgeted cost of work performed [BCWP] and the budgeted cost of work scheduled [BCWS]. This is calculated as follows: SV = Budgeted Cost of Work Performed - Budgeted Cost of Work Scheduled)
Schedule Viewvista Programación (An Outlook Calendar view in which each calendar is listed vertically (not side-by-side). This view is optimized for viewing a schedule for a group and scheduling a meeting for a group)
shared scheduleprogramación compartida (Schedule information that can be referenced by multiple items)
sync scheduleprogramación de sincronización (The times that will trigger automatic synchronization between a device and Exchange Server every time an item arrives or is modified in Exchange Server)
user-controlled schedulingprogramación controlada por el usuario (A feature that allows the user to specify manual or automatic scheduling on a per-task basis)
vesting scheduleplan de entrega (The manner in which-long term variable compensation is distributed to an employee. Long-term incentives are awarded at one time but distributed at a later time)