DictionaryForumContacts

   English Chinese
Google | Forvo | +
intensified plate-cooled system
met. 强化冷却板系统 (Design estimates indicated that with staves, the total cooling water requirement would be 10, 000 to 11, 000 gpm compared to a total cooling water requirement of 14, 000 to 15, 000 gpm with an intensified plate-cooled system. 设计评估表明,使用立式冷却壁冷却水总需求量为 10 000-11 000 gpm (UKgal/min); 相比之下,使用强化冷却板系统冷却水总需求量为14,000 ~ 15, 000 gpm。)