coste estimado al finalizar | estimate at completion (The expected total cost of a task or project, based on performance as of the status date. EAC is calculated as follows: EAC = ACWP + (BAC-BCWP)/CPI) |
costo estimado al finalizar | estimate at completion (The expected total cost of a task or project, based on performance as of the status date. EAC is calculated as follows: EAC = ACWP + (BAC-BCWP)/CPI) |
costo presupuestado al finalizar | budget at completion (The original project, resource, and assignment cost as shown in the baseline plan. The baseline cost is a snapshot of the cost at the time when the baseline plan was saved) |
Finalizar la compra | Checkout (The button that allows customers to finalize their purchase on a website) |
Finalizar la llamada | End the call (An infotip for the Hang Up button. The Hang Up button is a button on Phone Controls and Audio Controls) |
finalizar llamada | end call (An infotip for the button on the phone and video controls that ends the conversation) |
finalizar una llamada | end a call (To end a phone call) |
variación al finalizar | variance at completion (The earned value field that shows the difference between the budget at completion [BAC] and the estimate at completion [EAC]. In Project, the EAC is the Total Cost field, and the BAC is the Baseline Cost field) |