DictionaryForumContacts

   Chinese
Terms for subject Explosives and Explosive Ordnance Disposal containing | all forms
ChineseEnglish
之数额shortage
flush
轻重的经济价值economica. importance
abundant
的起爆效应adequate priming
的起爆药保证炸药在使用时可尽快达到最大速度An adequate priming ensures that the explosive will reach its maximum velocity as quickly as possible under the condition of use
剂量不underdose
务必保证最终产品以敏化、才可保证高阶爆轰Care must be taken to insure that the final product is adequately sensitized to insure high-order detonation
very
在爆破中产生飞石所消耗的能量低于传递给岩石全部能量的1%、因此以这种形式浪费的爆炸能可以说微不The energy spent in creating flyrock during blasting is less than 1 % of the total energy transferred to the rock, hence the wastage of explosive energy in this form maybe insignificant
当前排炮孔抵抗线不或钻孔偏离了设计的方向时、也会发生自由面破裂现象F-bursting can also occur when the front row has insufficient burden or drilling deviations from design
微不insignificant
轻重insignificant
轻重的人lightweight
火箭已装了燃料The rocket has been primed with enough fuel
炮泥不时会出现螺纹线。由于空气冲击波、螺纹线是由炮泥释放脉冲形成的R-occurs when stemming material is inefficient or insufficient. Rifling is driven by the stemming release pulse SRP for airblast
炮泥封填不undertamping
炮泥封填不understamping
科学模型、或者说基本模型、试图立于现实、描述爆破的物理效果和岩石的力学回应Scientific or fundamental models attempt to realistically describe the physical effects of blasting and the mechanical response of the rock
经济上举轻重economica. importance
虽说他20世纪是个无轻重的工程技术人员、但在炸药乳化制作方面却有至关重要的发现Although as an insignificant engineering technician last century, he made a significant discovery in the making of explosive emulsion
料不underloading
装药不的拉底炮孔fast
调查结果表明、飞石事故是由以下一个以上的因素促成的: 地质及岩石结构的非连续性、炮孔布置和装药量不适当、抵抗线不、炸药能量高度集中、填塞不足Investigations of flyrock accidents have revealed one or more of the following contributing factors: I discontinuity in the geology and rock structure,II improper blast hole layout and loading, III insufficient burden, IV very high explosive concentration, and V inadequate stemming
这些人往往会因为微不道的琐事而大发雷霆These guys tend to explode at any moment over the least thing
阳光充abundance of sunshine
飞石产生的主要原因包括抵抗线不、炮泥长度不够、钻孔不精确、单位炸药消耗量过多、地质条件不利露天节理、矿层不稳固和空穴、延时定时和序列不当、延时不精确、发生反向爆破、以及台阶上部岩石松散等The major causes of flyrock are inadequate burden, inadequate stemming length, drilling inaccuracy, excessive powder factor,unfavorable geological conditions open joints, weak seams and cavities, inappropriate delay timing and sequence, inaccuracy of delays, back break and loose rock on top of the bench