DictionaryForumContacts

   Chinese
Terms for subject Explosives and Explosive Ordnance Disposal containing | all forms
ChineseEnglish
上行次ascending order
下行次underhand stoping
传火ignition train
传火igniter train
传火low explosive train
传火burning train
传爆propagation sequence
传爆按感度递减、输岀能量递增的次序而排列的一系列爆炸元件的组合体。其功能是使一个小的冲能有控制地将输出能量扩大到足以引爆主装药high explosive train
作业调配程job scheduling routine
作用控制程job control program
使用电子延迟顺可以增加5 - 10个百分点的抛掷量、且不必增加炸药能量或其他爆破投人An increased throw of the order of 5 - 10 percentage points may be obtained through the use of electronic delay sequences, without any increase in explosives energy or other blast inputs
全天候年循作业all-weather year-round operation
冲击波超压能级受爆破设计、实施工及当时大气条件的影响Airblast overpressure levels are influenced by the blast design and its implementation,and the prevailing atmospheric conditions
分组程控制group sequence control
医生采用的治疗程被指控是玩忽职守The medical procedure the doctor fallowed laid him open to charges of negligence
处理程disposal procedure
多炮孔按顺定时爆破multi-hole sequential timer shot
孔间顺毫秒爆破这种起爆顺序也是从临空面开始,由前排向后排起爆,不过在同排中相邻炮孔间错开分成两组用两段起爆或单孔顺序起爆,因此,自由面增加,爆破方向交错,块度较均匀,减振效果好,但网路敷设复杂。由于前冲力较小,适用于压渣厚度小或只有3row4排炮孔的爆区row-hole delay MS blasting
定时timing sequence
岩体大规模破碎的最佳延时optimum delay sequences for fullscale fragmentation
应急程卡片张贴在运送炸药产品的卡车上的指示,给出紧急情况下专门程序。该指示存放在司机驾驶室中emergency procedure card
延时列号delay sequence number
延时和顺起爆的精度accuracy of timing and sequential firing
当量电子延迟equivalent electric delay sequence
抛掷爆破对装铲工的影响effects of cast blasting on dragline operations
拆除爆破工程的程实施拆除爆破工程应进行工作的先后顺序,包括: 1. 了解情况。 2. 可行性分析。 3. 签订工程合同。 4. 工程设计及上报。 5. 组织施工。 6. 爆破。 7. 二次爆破working procedure of blasting demolition project
指导程guideline procedure
按次sequential
排间顺毫秒起爆排间顺序毫秒起爆是从临空面开始由前排往后排以毫秒间隔顺序起爆。这种起爆顺序施工简便,爆堆比较均匀整齐,岩石破碎质量较齐发爆破有所改善。但是地震效应仍强烈,且后冲破坏较大row delay MS blasting
推荐使用电力起爆程recommended power line initiation procedures
放炮次lightning order
放炮次blasting sequence
放炮程ignition pattern
放炮顺blasting sequence
根据实际情况和计算药量、参照成功的有可比性的工程、确定药包个数、药量、布置位置、人水深度和起爆顺design procedure of water pressure blasting
毫秒延时列多排孔间隔爆破millisecond delay sequence rotation firing
水压爆破设计程:design procedure of water pressure blasting
点火按火焰感度递减、火焰强度递增的次序而排列的一系列输出火焰冲能的元件的组合体。其功能是将火帽〈或点火器〉的火焰冲能逐步递增并可靠地引燃火药或烟火主装药。参见 ignition train; burning trainburning train
点火按火焰感度递减、火焰强度递增的次序而排列的一系列输出火焰冲能的元件的组合体。其功能是将火帽〈或点火器〉的火焰冲能逐步递增并可靠地引燃火药或烟火主装药。参见 ignition train; burning trainigniter train
点火按火焰感度递减、火焰强度递增的次序而排列的一系列输出火焰冲能的元件的组合体。其功能是将火帽〈或点火器〉的火焰冲能逐步递增并可靠地引燃火药或烟火主装药。参见 low, explosive train;burning trainignition train
点火按火焰感度递减、火焰强度递增的次序而排列的一系列输出火焰冲能的元件的组合体。其功能是将火帽〈或点火器〉的火焰冲能逐步递增并可靠地引燃火药或烟火主装药。参见 ignition train; burning trainlow explosive train
点火按火焰感度递减、火焰强度递增的次序而排列的一系列输岀火焰冲能的元件的组合体。其功能是将火帽〈或点火器〉的火焰冲能逐步递增并可靠地引燃火药或烟火主装药。参见 ignition train;low explosive trainburning train
点火次lightning order
点火次firing sequence
点火顺ignition pattern
点火顺ignition order
烟火延时pyrotechnic delay sequence
然而、爆破所用炸药的特性、岩石类型或地质构造的物理特性或爆破定时起爆顺及由于这些因素的微妙差别所产生的相互影响均要考虑There is no simple way, however, to take into account the interactions resulting from subtle differences in the characteristics of the explosives the blaster had at his disposal, the physical characteristics of specific rock types or geological formations, or the effect of the changes in timing of the initiation sequence on his blast
爆后监测程post-blast monitoring procedure
爆炸为完成起爆、点燃等功能按顺序排列的一组火工品的组合。按其功能可分为 1. 传爆序列:完成起爆功能的爆炸序列, 2. 传火序列:完成点燃功能的爆炸序列firing sequence
爆炸为完成起爆、点燃等功能而按感度递减、能量输出递增顺序排列的一组爆炸材料的组合explosive train
爆炸流体力学区的计算机编码程计算机编码分类的一种,用来建立固体和液体变形和流动的模型。该术语也表示计算机编码利用颗粒间的基本联系来跟踪物体或流体在引爆初期其应力和化学反应的变化情况hydrocode
爆破人员应该始终遵循炸药厂家所推荐的起爆程、以确保所用炸药的最大爆速Blasters should always ensure a maximum velocity of the explosives to be used by following the priming procedures recommended by the explosives manufacturers
爆破次blast sequence
爆破现场程blast site procedures
爆破破岩程fragblast proceedings
爆破顺参见 ignition orderfiring order
爆轰程一种计算机程序,利用已知的炸药成分的化学性质预测一种炸药所释放的能量。这种程序的三个基本组成部分是:成分表、产物表和一个状态方程式detonation code
电子延时electronic delay sequence
电子雷管延时electronic detonator delay sequences
电引爆列定时器electric sequential timer
直到今天、炸药和爆破温室气体问题尚未在文献中予以充分考虑、而且尚未成为爆破破岩程的主题To date, the issue of GHGs from explosives and blasting has not been given wide consideration in the literature and has not been a subject of the fragblast proceedings
移交程hand-over procedure
计算任务的处理对象和处理规则的描述。在低级语言中,程序一般是一组指令和有关的数据或信息。在高级语言中,程序是一组说明和语句。程序是软件的本体,又是软件的研究对象program
通用结构分析非线性有限元程序,是显式动力学程序的鼻祖和先驱,常用于爆破模拟LS-Dyna IS-Dyna
控制系统又称自动操纵系统或顺序控制系统。是由程序控制装置和被控制对象组成的系统。与自动调节系统不同,是开环式的,而不是闭环式的,只能起操纵作用,不能起调节作用procedure control system
控制装置又称自动操纵装置。在人或程序信号发生器发出指令后,可以自动地启动或停止设备的操作或进行交换接通的操作procedure control device
设计设计、编制和调试程序的方法和过程。内容涉及有关的基本概念〈程序、数据、子程序、模块、并发性、分布性等〉、工具、方法以及方法学等programming
设计方法学以程序设计方法为研究对象的学科。它主要涉及用于指导程序设计工作的原理和原则,以及基于这些原理和原则的设计方法和技术,着重研究各种方法的共性与个性,各自的优缺点programming methodology
设计语言用于书写计算机程序〈习惯上指实现级语言程序〉的语言。程序设计语言包含三个方面,即语法、语义和语用。语法表示程序的结构或形式, 语义表示程序的含义, 语用表示程序与使用者的关系programming language
第一列关系first-order relationship
绝对程上传absolute programme loader
编程时间延迟顺program med time delay sequence
自动程控制计算机automatic sequence-controlled calculator
表观地层顺apparent superposition
装有嵌人式延时雷管的连接器早在20世纪50年代已付诸使用、借此进行程复杂的延时爆破设计Connectors with built-in delay detonators, allowing the design of complex delay shots, became available as early as the 1950s
规定程established procedure
起爆器程initiator sequencing
起爆程priming procedure
起爆药次排列initiator sequencing
起爆顺又称起爆计划。为实现连续爆破而制订的起爆时间和间隔的技术方案initiation plan
起爆顺initiation procedure
起爆顺initiating procedure
起爆顺initiation sequence
起爆顺initiating sequence
起爆顺priming sequence
起爆顺priming procedure
起爆顺采用导火索爆破时,为了依次扩大自由面,应从最短一根导火索开始点火, 采用延时电雷管爆破时,应从低段开始顺序起爆。如果点火顺序混乱,爆破就会失败ignition pattern
起爆顺又称起爆计划。为实现连续爆破而制订的起爆时间和间隔的技术方案initiation pattern
起爆顺又称起爆计划。为实现连续爆破而制订的起爆时间和间隔的技术方案initiating pattern
起爆顺又称起爆计划。为实现连续爆破而制订的起爆时间和间隔的技术方案priming pattern
起爆顺采用导火索爆破时,为了依次扩大自由面,应从最短一根导火索开始点火, 采用延时电雷管爆破时,应从低段开始顺序起爆。如果点火顺序混乱,爆破就会失败ignition order
起爆顺定时timing of initiation sequence
载人程loader
辅助工auxiliary operation
连续顺操作integrated operation
钻孔和爆破对下游工的影响drilling and blasting for downstream benefit
键能键模型bond energy bond order
阶段开采顺同一井田内各阶段的开采次序。阶段开采顺序分下行式和上行式两种。下行式是先采上阶段,由上往下逐阶段回采。上行式则相反mining sequence of level
定时控制爆破sequential timer-controlled blast
爆破series shot firing
起爆sequential firing
起爆器sequential initiation machine
风把她的头发吹得蓬乱无The wind blows her hair into disorder
飞石产生的主要原因包括抵抗线不足、炮泥长度不够、钻孔不精确、单位炸药消耗量过多、地质条件不利露天节理、矿层不稳固和空穴、延时定时和列不当、延时不精确、发生反向爆破、以及台阶上部岩石松散等The major causes of flyrock are inadequate burden, inadequate stemming length, drilling inaccuracy, excessive powder factor,unfavorable geological conditions open joints, weak seams and cavities, inappropriate delay timing and sequence, inaccuracy of delays, back break and loose rock on top of the bench