Terms for subject Drilling containing 完井 | all forms | in specified order only
ChineseEnglish
一次起下作业的标准完井系统single-trip standard completion system
三次完井triple completion
临时完井temporary completion
井下完井设备downhole completion equipment
井口完井well head completion
井底完善系数completion factor
先期裸眼完井initial open hole completion
一口井的初次完井initial completion (of a well)
单井口完井single wellhead completion
单层完井single zone completion
单层完井single completion
双层完井dual completion
双层完井completed-double-layer
双层完井dually completed
双层完井的上层upper zone of dual
双层完成的井dually completed well
双管分采完井two-string completion
双管两层分采完井two-tubing dual completion well
双管两层完井twin string dual-completion
只用衬管的完井liner-only completion
可移动的完井装置moving completion unit
可膨胀完井衬管expandable completion liner
后期裸眼完井final open hole completion
在一块油田能定的井位已钻完farm out
多层套管完井multiple completion
多层套管完成的井multicompleted well
多层套管完成的生产井multipay well
多层套管完成的生产井multiple completion well
多层完成的井multiple well
多层混合完井commingled well completion
多管完井multiple string completion
多管柱完井系统multi-string completion system
大修并二次完井workover and recompletion
美国季度完井报告Quarterly Completion Report
安装井口装置完井flanged-up completion
完井completing (ed, ion, 的)
完井complete
完井completion of well
完井completion
完井completed
完井complete (ed, ion, 的)
完井一修井液completion and workover fluid
完井封隔井段well completion interval
完井优化和评价实验室Completion Optimization and Assessment Laboratory
完井作业well completion operation
完井作业completion operation
完井作业completion practice
完井作业drilling completion operation
完井作业completion job
完井/修井completion/workover
完井关井压力final shut-in pressure
完井层段completion interval
完井工具completion tool
完井工具运进井场moving in completion tool
美国完井工程协会Completion Engineering Association
完井技术completion technique
完井投产bring in a well
完井指数completion factor
完井控制complete well control
完井措施completion method
完井方案drilling completion program
完井方法completion method
完井well completion fluid
完井completion fluid
完井液防漏堵塞材料completion fluid bridging material
完井用盐水completion brine
完井用立管completion riser
完井用钻机completion rig
完井程序completion sequence
完井系统completion system
完井设备运进井场moving in completion unit
完井质量评价completion evaluation
完井顺序completion sequence
完成井completed well
完成井继续再钻reentry
完钻井深final depth
完钻井深total depth drilled
完钻井深depth out
完钻井深为..bottomed at…
完钻垂直井深total vertical depth
实测完钻井深measured total depth
射孔完井perforation completion
射孔完成的井perforated well
射孔完成的井perforated hole
小井眼完井slim hole completion
小井眼多层完井small diameter multiple completion
尾管射孔完井liner perforation completion
常规双油层段完井conventional two zone completion
干式完井装置dry completion unit
平行完井parallel completion
微粒盐钻井液/完井液/修井液micronized salt system
商品名探井或完井用轻便钻机Fort Worth Spudder
搬出完井设备moving out completion unit
搬出完井钻机moving out completion rig
斜井完井设计deviated well completion design
无污染完井non-damaging completion fluid
智能完井系统intelligence completion system
最佳完井completion optimization
水下完井underwater completion
水下完井装置subsea completion system
水动力学性质不完善井hydrodynamic property incompletion well
水动力学程度不完善井hydrodynamic degree incompletion well
水泥封固完井set-through completion
永久型完井permanent-type well completion
永久型完井permanent type completion
永久性完井permanent well completion
测井完成log out of hole
测量完钻井深measured total depth
深井完井deep hole completion
用..完井completed with
用..完井complete with
商品名用作封隔液和完井液的氯化钙水溶液比重为 1.08〜1. 39 haviwater II Packer and Complete Fluid 商品名 用作封隔液和完井液的氯化钙水溶液Haviwater I Packer and Complete Fluid
砂控完井优化程序sand control completion optimization program
砾石充填完井gravel packer completion
等待完井工具waiting on completion tools
等待完井设备waiting on completion rig
草率完工的井contractor's hole
裸眼完井finish barefooted
裸眼完井run barefoot
裸眼完井casingless completion
裸眼完井barefoot completion
贯眼完井perforated pipe completion
运进完井钻机moving in completion rig
近表层完井near surface completion
远程通用钻井和完井系统remote universal drilling and completion system
选择性完井工具selective completion tool
重新完井recompletion
完井drilling out of hole
钻井/完井两用钻机piggy-back rig
钻井/完井post-well
钻井/完井后评价post-well review
刊名,美国 SPE 钻井与完井society petroleum engineers Drilling and Completion SPE
刊名,美国 SPE 钻井与完井SPE Drilling and Completion SPE
钻井和完井drilling and well completion
钻井和完井drill and complete
钻达完钻井深bottom out
预计完井日期estimated date of completion
高压完井high pressure completion
高含硫化氢气井完井high H2S gas well completion
高温完井high temperature completion