English | Russian |
ad materials | рекламные материалы |
bill of material version | версия спецификации (A specific configuration of a bill of material (BOM) to include an item. An item can be associated with a number of BOM versions) |
bill of materials explosion | развёртывание спецификации (The process of identifying the components, and their quantities, that are required to produce an item) |
bill of materials item | номенклатура спецификации (An itemized product defined by a bill of materials) |
class materials | учебные материалы (Content and resources that are made available as part of a class and that can be associated with individual lessons or assignments) |
diffuse material | рассеивающий материал (A type of material that determines the color of the 3D object with direct light (white light) applied to it much like the paint on a wall) |
emissive material | излучающий материал (A type of material that causes the object to appear as if it is giving off light. The color of the light is determined by the color of the material) |
finite material | ограничение по материалам (A method for scheduling resources that assumes that all the component materials needed for production are available when the production process starts) |
fixed material consumption | фиксированное потребление материальных ресурсов (ssn) |
infinite material | без ограничения по материалам (A method for scheduling resources that assumes that all the component materials needed for production are available at the time they are needed) |
keying material | ключевой материал (The PIN, keys, base prime numbers or other data used in encryption to establish and maintain secure communication) |
keying material | материал ключа |
limited material | ограничение по материалам (A method for scheduling resources that assumes that all the component materials needed for production are available when the production process starts) |
material label | единица измерения материалов (The unit of measure for a material resource, such as tons, cubic yards, or board feet) |
packaging material | упаковочный материал (The material used to bundle goods for protection during shipment) |
phantom bill of material | виртуальная спецификация (" A bill of material used to describe the components of a parent part that will be built as part of a higher-level parent part. The term "phantom" is used to indicate that the part never really exists as a stocked item, but rather is built in line with the production of the higher-level part that is driving an overall production order. ") |
phantom bill of materials item | искусственная номенклатура спецификации (A bill of materials item that is produced but not stocked) |
return materials authorization number | RMA-номер (A reference number that is used to authorize and track goods returned for repair or refund. A return materials authorization is issued by a sales entity that authorizes a buying company to return goods) |
specular material | отражающий материал (A type of material that controls the color of the specular highlight on a 3D object) |
sub bill of material | подспецификация |
sub-bill of material | подспецификация (A bill of material that makes up a component of another bill of material) |
time and material project | проект "Время и расходы" (An external project that is invoiced as work progresses based on the consumption of hours, expenses, items, fees, and on-account transactions) |
time and materials | Время и расходы |
time and materials project | проект с оплатой по факту (A project where the vendor invoices the customer based on work completed on the job. There is a direct relationship between the invoice lines and the usage already performed on the job) |
unlimited material | без ограничения по материалам (A method for scheduling resources that assumes that all the component materials needed for production are available at the time they are needed) |
variable material consumption | неравномерное потребление материала (The time-based quantity of material resource to be used in an assignment. A variable consumption indicates that the amount of material that is used changes if the task duration or assignment length changes) |