Terms for subject Aviation containing change | all forms | exact matches only
EnglishChinese
active change events有效更改事件
active change events主动更改事件
administrative engineering change proposal管理工程更改建议
advance change先行更改
advance change notice先行更改通知
advance change/study notice先行更改/研制通知
advance change study notice先行更改研究通知
advance drawing change notice先行图纸更改通知 (对已发放的图纸页进行更改的正式记录,用来描述一个不更改原图纸页本身,ADCN 将代替或补充该图纸页上的信息附加上去,ADCN 是最新信息并且是该图纸的一部分)
advance engineering change proposal先行工程更改建议
advance planning procedure change先行计划程序更改
advance tool change notice先行工装更改通知
advanced change notice先行更改通知
advanced drawing change notice先行图纸更改通知
aircraft armament change航空军械更改
aircraft change application list飞机更改应用表
aircraft change control board飞机更改控制委员会
Aircraft Change Control Board飞机更改控制中心
aircraft configuration change飞机构型更改
aircraft airplane configuration change飞机构型更改
aircraft configuration change board飞机构型更改委员会
aircraft frame change飞机构架更改
aircraft service change飞机服务更改
airplane change analysis飞机更改分析
airplane configuration change飞机构型更改
altitude change高度变化
analysis of spare parts change备件更改分析
armament material change武器材料更改
assemble outline ink change装配大纲的墨水更改
assessment on production process change result生产过程更改结果评估
ATC frequency change service空中交通管制频率交换服务
audio frequency change声频变换
authorized notice of change批准的更改通知
automated change tracking system自动更改跟踪系统
automatic tool change of high speed spindle高速轴的自动换刀
aviation armament change航空军械更改
aviation material change航空器材更改
BOECOM change report波音通信更改报告
budget change proposal预算更改申请
cabin pressure change rate座舱压力变化率
cabin pressure change rate limiting device座舱压力变化速率限制器
change action authorization更改措施批准
change action plan/status record更改活动计划/状态记录
change activity更改活动
change advise number更改建议号
change advise number更改通知单
change analysis board更改分析委员会
change analysis commitment更改分析承诺
change analysis sheet更改分析单
change approval board更改审定批准委员会
change audit group更改审核组
change authority更改授权
change board更改委员会
change board action更改委员会措施
change board analysis record更改委员会分析记录
change board commitment record更改委员会承诺记录
change board committed change更改委员会承诺的更改
change category更改类别
change, changes变化
change, changes改变
change, changes变换
change, changes更改
change channel改变频道
change commitment record更改提交记录
change commitment schedule更改承诺计划
change commitment summary更改承诺总结
change compliance and change commitment tracking更改符合和更改承诺跟踪
change compliances reporting system更改符合报告系统
change coordination record部门工作授权更改协调记录
change changed data report更改数据报告
change design order设计更改指令
change documentation更改文件
change engineering order工程更改指令
change evaluation更改评估
change evaluation control board更改评估管理委员会
change event code更改事件代码
change events更改事件
change identification number〔客〕更改识别号
change identifier更改标识
change impact board更改影响委员会
change impact report更改影响报告
change impact summary更改影响总结
change implementation board更改执行委员会
change implementation plan更改实施计划
change implementation point更改实施点
change improvement plan更改改进计划
change incorporation notice更改合并通知
change incorporation request更改合并要求 (这是波音公司使用的关于工程更改协调文件,要求波音公司的供应商承诺某项工程更改的生效架次,它是一种表格,主要的有以下内容:记录号、更改类别、合同号、要求供应商答复日期、产品型号、要求的生效架次、产品数据管理模块更改信息、产品数据管理零件和图纸更改信息、更改说明、供应商零件影响、供应商工装影响、供应商承诺等)
change incorporation request更改合并需求
change initiation action or change infor-mation更改初始活动或更改信息分析
change initiation action or change information analysis更改开始生效或更改信息分析
change item更改项目
change level更改层次级别
change level更改级别
change management更改管理
change management board更改管理委员会
change management change control system更改管理更改控制系统
change management council更改管理委员会
change management directive更改管理指令
change management exchange更改管理交流
change management exchange更改管理交换
change management exercise更改管理训练
change management function更改管理功能
change management integration and incorporation team更改管理综合和合并队
change number更改号
change number and ADCN status更改号和先行图纸更改通知状况
change number and ADCN status更改号和先行图纸更改通知状态
change number and ADCN system更改号码和先行图纸更改通知系统
change number and effectiveness更改号和有效性
change-over rail mechanism for launch pad发射台转轨装置
change package更改工作包
change package identification更改包装标志
change package identification更改包装标记
change page as required按需更改页次
change planning group更改计划组
change process flow更改流程
change proposal更改建议
change record更改记录
change record sheet更改记录页
change report更改报告
change report review board更改报告审查委员会
change request更改请求
change request更改要求
change request更改申请
change request更改需求
change request更变要求
change request disposition更改请求处理
change request proposal更改要求建议
change request reporting更改请求报告
change request reporting system更改请求报告系统
change request review board更改申请审査委员会
change request work statement更改要求工作说明
change request work statement更改需求工作说明
change review board更改审査委员会
change review group更改审査组
change schedule chart更改计划图表
change section index更改部分索引
change status更改状态
change summary更改摘要
change to frequency调到…频率
change verification record更改审査记录
clearance change间隙变化
client change notice用户变更通知
command change schedule指令更改计划
commercial change estimate memo商用更改评估备忘录
commercial change proposal商用更改建议
committed change event log承诺的更改事件记录
committed change request承诺的更改要求
committed change requirements file承诺更改需求文件
common change process通用更改程序过程
computer program change instruction计算机程序更改说明
computer program change library计算机编程更改库
computer program change request计算机编程更改申请
configuration change构型更改
configuration change配置改变
configuration change and variance management构型更改和改型管理
configuration change and variance management更改构型和变型管理
configuration change board构型更改委员会
configuration change control board构型更改控制委员会
configuration change control构型更改控制
configuration change number构型更改号
configuration change point构型更改点
configuration change processing构型更改处理
configuration change processing构型更改过程
configuration change proposal构型更改建议
configuration change support data构型更改支持数据
configuration change team构型更改小组
configuration development and change process构型开发和更改程序
constants change display恒量更改显示
contractor change request承包者更改需求
coordination of engineering change工程更改协调
crew procedures change request乘务员程序更改申请
current change vehicle现行的飞行器
current change vehicle现行更改媒介
cut to length or change letter按长度切割或更改字
DELTA changeDELTA 更改
density change密度改变
detailed material requisition list change notice材料需求明细表更改通知 (航空产品生产用表 SAMC12-146)
diagram change history status inquiry图表更改历史状况调查
discharge loss change放电损失变化
document change list文件更改单
document change notice文件更改通知
document change record文件更改记录
document change review文件更改审查
document inter-change architecture文件交换结构 (美国 IBM 公司)
documentation change notification文件更改通知
Douglas quality specification change notice道格拉斯质量规范更改通知
electrical liaison change commitment record电气联络更改承诺记录
electrical liaison change commitment record电气联络更改提交记录
electrical liaison change commitment report电气联络更改承诺报告
electronic material change电子材料更改
emergent change notice应急更改通知
emergent quick change紧急快速更改
energy change能量变化
energy change能变
engine change发动机更改
engine change换发
engine change unit发动机更改装置
engineering change工程更改 (原麦道、波音、空客的工程图纸始终处于频繁的更改之中,原因有三个方面,其一,是根据不同客户提出来的要求,以便满足它们,从而使产品有广泛的销路; 其次是从实际使用的效果出发,对产品的性能、工艺、强度、结构以及节约成本等方面进行更改,不断完善,有利于市场竞争,特别是在市场经济的条件下,这一点尤为重要; 再者是由于工作上的疏忽,或限于当时的条件而造成的差错或不尽完善等需对图纸、规范、标准进行的更改,这就是工程更改。简言之,即设计工程部对产品图样进行更改)
engineering change action工程更改措施
engineering change analysis工程更改分析
engineering change and configuration management工程更改和构型管理
engineering change board工程更改委员会
engineering change classification工程更改分类
engineering change commitment summary工程更改承诺摘要
engineering change committee工程更改委员会
engineering change control工程更改控制
engineering change control board工程更改管理委员会
engineering change data sheet工程更改数据页
engineering change definition工程更改定义
engineering change differences lists工程更改偏差清单
engineering change identity parts list工程更改相应零件细目表
engineering change information工程更改通知
engineering change justification code工程更改论证代码
engineering change list工程更改清册
engineering change management工程更改管理
engineering change memo工程更改备忘录
engineering change memorandum工程更改备忘录 (Memo)
engineering change note工程变更说明
engineering change note工程更改通知单
engineering change number工程更改号
engineering change package工程更改工作包
engineering change priorities工程更改优先次序
engineering change procedure工程更改程序 (program)
engineering change proposal〔支〕工程更改建议
engineering change proposal工程修改建议
engineering change proposal types工程更改建议类型
engineering change proposal work statement工程更改建议工作说明
engineering change record system工程更改记录系统
engineering change request工程更改需求
engineering change request and analysis工程更改申请和分析
engineering change request/authorization工程更改申请/批准
engineering change revision instruction工程更改修订说明
engineering change schedule工程更改计划
engineering change sheet工程更改单
engineering change summary工程更改总结
engineering configuration change request工程构型更改申请
engineering drawing change工程图纸更改
engineering field change工程外场更改
engineering liaison change completion report工程联络更改完成报告
engineering liaison request/advance drawing change notice工程联络申请/先行图纸更改通知
engineering order change工程指令更改
engineering quick change工程快速更改
engineering release change request工程发放更改申请
entity per aircraft change〔客〕航行器更改的实体
expedited engineering change proposal快速工程更改建议
explosive echo ranging change爆炸回波测距变化
extrusion material change挤压型材材料更改
field change场地更改
field engineering design change schedule现场工程设计更改计划
general purpose change一般性更改
implementation and tracing of engineering change工程更改的跟踪与落实
information design change信息设计更改
information design change list信息设计更改表
instruction change request指令更改要求
integrated change control总体更改控制
integrated change control〔客〕综合更改管理
integrated change control board综合更改管理委员会
inter-departmental change notice部门间更改通知
interface change notice界面/接口更改通知
interface change package界面/接口更改包
interface change request接口更改要求
interface change summary界面/接口更改摘要
interface expedited engineering change proposal界面/接口简化工程更改建议
intergovernmental panel on climate change政府间气候变化研究组
interim change临时更改
interim change bulletin临时更改通报
interim message change临时信息更改
item change analysis项目更改分析
kit engineering change proposal配套件工程更改建议
land use and cover change土地利用/土地覆盖变化
major sub-contract change主转包合同更改
major subcontract change approval主转包合同更改批准
major subcontract change coordination主转包合同更改协调
major subcontract change order主转包合同更改指令
major subcontract change request主转包合同更改申请
major subcontract change request/approval主转包合同更改申请/批准
major subcontractor change coordination主转包合同更改协调
major subcontractor change request/approval主转包合同更改申请/批准
management change notice管理更改通知
management change review committee管理更改审查委员会
mandatory change指令性更改
mandatory miscellaneous change process强制性的杂项更改流程
manual change order人工更改指令
manual change request人工更改请求
manufacturer change request制造厂更改申请
manufacturer specification change note制造厂规范更改说明
manufacturing change analysis制造更改分析
manufacturing change in design设计制造更改
manufacturing change incorporation notice制造更改合并通知
manufacturing change management制造更改管理
manufacturing change point制造更改点
manufacturing change request制造更改申请
manufacturing interchange change request制造互换更改申请
manufacturing planning change制造计划更改
manufacturing planning change coordination制造计划更改协调
manufacturing requirement change制造需求更改
manufacturing specification change record制造规范更改记录
mass change质量变化
mass change log质量更改记录
master change主要更改
master change kit主要更改配套件
master change log主要更改记录
master change memorandum主要更改备忘录
master change notice主要更改通知
master change proposal主要更改建议
master change record主更改记录
master change request主更改申请
master change review board主要更改审査委员会
master change schedule主更改计划
measurement requirement change request测量要求更改申请
message change信息更改
minimum plane change最小平面变化
MLO design and change模线的设计更改 (模线的设计和更改依据是工程数据集、工程指令 EO、工装设计图,并且只按工装指令 TO 、检验数据申请、二类工装申请单进行设计及更改)
MLO design and change procedure模线的设计及更改程序
mode change模式变换
mode change模式变化
modification level change commitment record更改等级更改承诺记录
momentum change动量变化
multi-point change-over switch多切点切换开关
negative plane change负平面变化
negotiable change协调更改
next change item下-个更改项目
no change无更改
no significant change无显著变化
noise equivalent reflectance change等效噪声反射变化
on change正在更改中
operation and inspection record change notice report操作和检验记录更改通知报告
operation plan change request操作计划更改要求
operation plan change request操作大纲更改需求
page change notice页次更改通知
part card change notice零件卡更改通知
part change incorporation notice零件更改合并通知
percent change百分比变化
performance change性能差异
performance change性能变化
personality change人格变化
personality change个性变化
plane-change变轨道面
plane change飞机更改
plane change变轨道面
plane change engine变轨道面发动机
planning change board计划更改委员会
planning change incorporation record计划更改合并记录
planning change request工艺更改申请
planning change request计划改变请求
position change位置变化
post delivery change交付后更改
power plant change动力设备更改
pressure change压力变化
pressure change rate压力变化率
primary description of change更改的主要说明
problem change report难题更改报告
procedure change notice程序更改通知
procedure change request程序更改申请
process change design notice工艺更改设计通知
process engineering change order工艺工程更改指令 (适用于转包项目,是一种由客户给定,用以发放和修订客户工艺标准、客户材料规范和型号光饰规范)
process specification advance change notice工艺规范先行更改通知
process specification change notice工艺规范更改通知
production change生产更改
production change control生产更改控制
production change incorporation notice生产更改合并通知
production change number生产更改号
production change record生产更改记录
production change request生产更改申请
production development change notice产品研制更改通知
production order and record change notice生产指令和记录更改通知
production planning change request生产计划更改需求
production process change生产过程的更改 (是指包括工艺过程、工艺标准及规范、生产设备、工装和编程在内的更改,这种更改必须得到批准)
production process change control and assessment生产过程更改控制评估表
production process change group生产过程更改评估小组 (按生产过程的更改程序《QP-3024-MP -026》定义,由执行生产过程更改的部门组成的一个小组,这个小组对生产过程的更改进行控制,并对生产过程更改的结果进行评估)
production revision record/master change review board生产修订记录/主要更改审查委员会
program change board项目更改委员会
program change control management项目更改控制管理
program change control system程序更改控制系统
program change decision项目/程序更改决定
program change directive项目/程序更改指示
program change identification number项目更改标识号码
program change notice程序更改通知
program change proposal项目更改建议
program change review board项目更改审査委员会
program PFP change record数控程序投产验证修订记录
program requirements change board程序要求更改委员会
program schedule change memo程序计划更改备忘录
project budget change notice项目预算更改通知
project change board项目更改委员会
project/miscellaneous change board项目/综合更改委员会
proposed change建议的更改
proposed interface change notice建议的界面接口更改通知
proposed notice of change被提议的更改通知
publication change record出版物更改记录
publication change request出版物更改要求
quick change快速更改
quick change assembly快速更改装配
quick change blanking tool快速更改落料工装
quick change real-time快速更换的实时操作
quick change unit快速更改装置
quick engine change发动机快速更换
quick engine change发动机〔的〕快速更换
quick engine change assembly发动机快速更换组件
quick engine change kit发动机快速更换配套件
quick engine change stand发动机快速更换台
quick reaction change快速反应更改
quick transmission change快速传输更改
rate of change更改率
record change记录修改
record change记录更改
release engineering change proposal发放工程更改建议
reply for engineering change request工程更改请求答复
report change notice报告更改通知
request altitude change enroute请求途中改变高度
request for change更改申请
request for change更改请求
request for change proposal更改建议申请
request for design change设计更改申请
request for document change文件更改申请
request for engineering change proposal工程更改建议请求
request of change更改申请
requirements allocation change request需求配置更改请求
requirements change notice需求更改通知
requirements change proposal要求更改建议
retrofit change action request改型式样翻新更改活动申请
role change package任务更改工作包
scale change刻度变化
scale change标度改变
schedule change authorization计划更改授权
schedule change board计划更改委员会
schedule change request计划更改申请
service action change analysis维护活动更改分析
service and overhaul change维护和大修更改
service and overhaul change维修和大修更改
service change服务更改
service change information服务更改信息
significant change显著变化
site equipment change rate发射场设备更换率
site peculiar facility change特殊设备现场更改
spare parts change notice备件更改通知
spec change log专用更改记录
special change notice特别更改通知
staff officer in change of administration在更改机构中的参谋官员
standard change标准更改
standard change integration and tracking标准更改综合与跟踪
standard specification change notice标准规范更改通知
status change telex状态更改电传
subcontract engineering change proposal转包合同工程更改建议
subcontract program change action application sheet转包项目更改活动申请单 (由各职能部门按需向转包项目更改委员会提请处理有关工程更改问题的表格)
subcontract program change board coordination sheet转包项目更改委员会协调单 (用于记录工程更改架次协调过程的专用表格。当收到客户发来的更改工作包后,由更改委员会执行主席认真理解后发往各相关单位进行评审,如工程部门解释本次更改的工程含义; 制造部门提出更改影响的站位和相关的工艺文件; 制造车间提出零件的加工周期,采购部门给出新材料等的采购周期; 工装设计和制造部门提出完成相关工装的设计和制造周期; 质量部门提出质保及是否首检的计划等,回收后由更改委员会执行主席给出生效架次,并与客户进行协调后确定)
subcontractor change proposal次承包商更改建议
subcontractor change request转包商更改申请
supplier change proposal供应商更改建议
supplier change request供应商更改申请
supplier change request供应商更改要求
supplier change review committee供应商更改审查委员会
supplier configuration change request供应商构型更改申请
supplier engineering change proposal供应商工程更改建议
supply item design change供应项目设计更改
system change control board系统更改控制委员会
system change notification系统更改通知
system change package系统更改工作包
system change record系统更改记录
system change request系统更改申请
system change request系统更改需求
system change review group系统更改审査组
system interfaces change系统接口更改
technical change meeting技术更改会议
technical change memo技术更改备忘录
technical change package技术更改工作包
technical change summary技术更改摘要
technical facility change procedure技术设施更改程序
technical order change技术指令更改
technical order change notice技术指令更改通知
technical order field change notice技术指令范围更改通知
temporal change暂时变化
temporary change of station暂时改变位置
temporary change procedure临时更改程序
temporary configuration change临时构型更改
test change commitment board试验更改承诺委员会
test change notice试验更改通知
test change proposal试验更改建议
test operations change测试操作更改
test site change request试验场地更改申请
tooling change工艺装备更改
tooling change工装更改
tooling change notice工装更改通知 (notification)
tooling specification change notice工装规范更改通知
universal problem change report通用问题更改报告
value engineering change proposal价值工程更改建议
vehicle engineering change implementation board飞行器工程更改执行委员会
velocity change速率变化
velocity change indicator速度变化指示器
vertical flight level change垂直飞行高度更改
virtual change虚拟的变化
visual change list目视更改清单
voltmeter change-over switch电压表转换开关
wire information release system change request导线信息发放系统更改申请
wire manufacturing change notice导线制造更改通知
wiring change request配线更改申请
wiring diagram change information配线图更改信息
wiring diagram committed change配线图承诺的更改
wording change改变用词
wording change改变措词