DictionaryForumContacts

   English
Terms for subject Metallurgy containing bells | all forms | exact matches only
EnglishChinese
area underneath bell钟形隔离罩下的区域 (CAS 法或 CAS-OB 法用语)
bell and hopper【铁】 料钟和料斗 (Bell and hopper is a charging apparatus at the top of a blast furnace and so devised that the raw materials can be fed into the furnace while the escape of gas is prevented. 料钟和料斗是一种高炉炉顶装料设施,如此设计可将炉料装人炉中,而又能避免炉顶煤气逸出。)
bell and hopper equipment【铁】 钟斗式设备
bell and hopper top单钟炉顶
bell and hopper top【铁】 钟斗式炉顶
bell and plain end joint管套接
bell and spigot joint承插结合 【头】
bell annealing furnace罩式退火炉 (These modernization projects include: No.3 Sendzimir mill; No.2 skinpass mill; automatic shape control on No.2 Sendzimir mill; CNC roll grinders; No.3 slitting and packaging line; cut to length line upgrade; No.9 and 10 bell annealing furnaces; upgrade of cooling and electrolytic pickling sections of No.1 annealing and pickling line. 这些现代化项目包括 3 号森吉米尔式轧机、2号平整轧机、2号森吉米尔式轧机的形状自动控制装置、 CNC 轧辊磨床、3 号纵剪/打包作业线、定尺切割生产线升级改造、9号和 10 号罩式退火炉和 1 号退火和酸洗生产线的冷却及电解酸洗段改造。)
bell batch type furnace台车底的罩式热处理炉
bell bearing【铁】 钟杆推力轴承
bell centre punch【压】 自动定心冲头
bell-charged blast furnace料钟装料式高炉
bell counter weight料钟平衡锤
bell-less BF top无料钟炉顶 (【技】1972 年由卢森堡保尔乌斯 (PW) 公司研制成功,亦称 PW 无料钟炉顶。其主要优点如下:1. 基建投资少。无料钟炉顶高度比钟阀式低1/3,设备重量减少到钟阀式高炉的1/2 ~ 1/3。休风率减少80% -90%,维修费用低,炉顶设备总功率只有普通炉顶的1/5。2.取消了笨重而又要精密加工的大钟,代之以积木式的部件,使得制造、运输、安装、维修和更换都极为方便。3. 采用旋转溜槽布料,布料方式多样,能满足高炉工艺操作的要求。4. 密封性能好,摩擦、磨损少,寿命长,能满足高炉的高压操作。)
bell-less BF top高炉无钟炉顶
bell-less charging device无料钟装料装置
bell-less charging equipment无料钟装料设备
bell-less distributing device无钟布料装置
bell-less top无料钟式炉顶
bell-less top无钟炉顶
bell-less top charging钟炉顶装料
bell-less top distributor无钟炉顶布料器
bell-less top equipment无料钟炉顶设备
bell-less top blast furnace钟式高炉 (For bell-top furnace, stockline level is the horizontal line at the bottom of the large bell when closed. For bell-less top furnace, stockline level is the horizontal line located below the tip of the rotating chute in the 90° (vertical) position. 对于钟式高炉,料线零位指的是大钟关闭时,大钟下沿水平线位置。对于无钟式高炉,料线零位指的是旋转溜槽处于90。,即垂直于(料面)位置时,溜槽下端水平线位置。)
bell-less top of blast furnace高炉无钟炉顶
bell-less top operation无钟炉顶操作
bell-less top system无钟炉顶系统
bell-less top with hopper containers in parallel and series mode串并罐式无料钟炉顶
bell-less top with parallel hoppers并罐式无钟炉顶 (高炉的)
bell-less top with series hopper串罐无钟炉顶
bell-less top with two coaxial vertical hoppers串罐无钟炉顶
bell mouth导卫装置的喇叭口
bell of die拉模人口锥
bell operating mechanism料钟操作机构
bell overhang大钟凸缘高度
bell rod【铁】 钟杆
Bell's reaction【铁】 贝尔反应 (即一氧化碳分解反应 2CO CO₂ +C)
bell shaped die放射形拉模
bell-top blast furnace料钟式高炉
bell-top blast furnace钟式高炉
bell-type annealing furnace罩式退火炉
bell-type annealing line罩式退火机组
bell-type annealing plant罩式退火设备
bell-type charging equipment料钟式装料设备
bell-type distributing gear钟罩式布料机构
bell-type heating furnace罩式加热炉
bell wire rope料钟钢丝绳
big bell【铁】 大钟 (高炉的)
big bell dimension大钟尺寸
big bell manufacture大钟制作
big bell material大钟材质
big bell shape大钟形状
big bell weld大钟焊缝
blast furnace bell高炉料钟
blast furnace bell operation高炉料钟操作
blast furnace top bell高炉料钟
blast furnace with bell-less top无料钟炉顶高炉
bottom bell【铁】 大料钟
bottom of large bell【铁】 大钟下沿
burden material leaving large bell离开大料钟的炉料
charging bell【铁】 料钟
charging bell gear【铁】 料钟机构
charging bell of blast furnace高炉料钟
clearance between large bell and throat wall大钟与炉喉间隙 (The critical dimensions are the stockline elevation and the clearance between the large bell and the throat wall. 关键尺寸是料线深度和大钟与炉喉间隙。)
control system of bell-less top无料钟炉顶控制系统
desulphurization by bell-jar process钟罩脱硫法 (【技】将脱硫剂放人专门钟罩内插人铁水中进行脱硫的铁水预脱硫方法。)
detachable bell mandrel可拆钟形芯轴
die bell拉模人口锥
distributing bell【铁】 布料钟
distribution pattern of bell-less top无料钟炉顶布料方式 (【技】无料钟炉顶布料方式有:①单环布料。旋转溜槽只在一个设定的角度做旋转运动。流槽倾角越大,炉料越分布到边缘。②螺旋布料,即从外环某一个环位开始,逐渐向里环进行布料。③扇形布料。可在选定的水平角度中进行定区域布料。④定点布料。)
double-bell【铁】 双料钟
double-bell and hopper arrangement双钟双料斗装置
double-bell and hopper arrangement【铁】 双钟装料装置
double-bell and valve charging equipment【铁】双钟双阀式装料设备
double-bell charging equipment双料钟装料设备
double-bell charging equipment【铁】 双钟装料设备
double-bell charging mechanism【铁】 双钟装料机构
double-bell system【铁】双料钟系统
double bell top双料钟炉顶
double-bell top【铁】 双料钟炉顶
double-bell type charging equipment【铁】 双钟式装料设备
double-charging bell【铁】双料钟
double-layer bell-type furnace for sintering双层烧结钟罩式炉
electric bell annealer罩式退火电炉
forming bell碗模 (炉焊管生产用)
furnace bell sinter人炉烧结矿
furnace top bell炉顶料钟
gas kick between bells料钟间的煤气反冲
gas kick between the bells【铁】料钟间的煤气反冲
gas-seal bell【铁】 气密料钟
hydraulic bell hoist【铁】 液压料钟卷扬机
hydraulic al bell hoist【铁】 液压料钟卷扬机
isolation bell【铁】 料钟
Koppers-Wurth bell-less top charging system【铁】考伯斯-沃思无料钟炉顶装料系统
large bell【铁】 大钟
large bell angle大钟倾角
large bell cup大钟料斗
large bell hopper【铁】 大料斗
large bell rope大钟操纵钢丝绳
large bell rope【铁】 大料钟操纵钢丝绳
lower bell【铁】 大料钟
Mohr three bell charging system【铁】 莫尔三钟式装料装置
one-piece bell【铁】 整体料钟
Paul Wurth bell-less top保尔乌斯无料钟炉顶 (【技】20世纪70年代初由卢森堡保尔乌斯公司研制成功,在德国蒂森钢公司汉伯恩厂首先投人使用。无料钟炉顶是一种完全有别于钟式布料方式的新型高炉布料装置,其主要特点是:取消了传统的大小料钟机构,采用了可任意改变倾角的旋转溜槽完成布料作业。旋转溜槽的倾角、转速和转速都可以调节,因此可灵活地实施各种布料方式。: The Paul Wurth bell-less top provides much flexibility for burden distribution of blast furnace and can produce almost any combination of layers, including the flat profile seen in part (c) of Figure 5. 保尔乌斯无料钟炉顶为高炉布料提供了极大的灵活性,它几乎可以给出任何料层形状的组合,其中包括图 5c 中所示的平面料层。)
Pilger bell end【压】 皮尔格头
pneumatic bell hoist【铁】 气动料钟卷扬机
sealing characteristic of bell料钟的气密性
sealing characteristic of bells料钟气密性
single bell charging equipment单钟装料设备
single bell top【铁】 单料钟炉顶
sinter bell jar烧结钟罩
small bell【铁】 小料钟
stroke of bell【铁】 料钟行程
three-bell【铁】三料钟 (的)
three-bell operation三料钟作业
three-bell operation三料钟装料
three-bell system三钟系统
three-bell top三钟炉顶
three-bells operation三料钟装料
three-bells operation三料钟操作
throat-bell height【铁】 炉喉-料钟间高度 (Throat-bell height refers to the vertical distance between the upper termination of the throat section and the bottom of the large bell when closed. 炉喉-料钟间高度指的是炉喉上沿至大料钟关闭位置的下沿之间的垂直距离。)
top bell小料钟
top bell顶部料钟
top bell【铁】 小钟
two-bell system【铁】 双料钟系统
two-bell top charging device双钟炉顶装料设备
upper bell【铁】 小钟
vacuum-tight water cooled metal bell烧结炉真空密闭水冷金属钟形罩